GROUP COMPANIES

Aiming to promote the energy potential of our country, our company has built an environmentally-friendly hydropower plant capable of producing reliable energy with zero polluting effect by adopting a green approach during and after the construction phase.

HYDROELECTRIC PLANTS

CANSU ELEKTRİK ÜRETİM A.Ş.

CANSU HYDROELECTRIC POWER PLANT-ARTVİN

Cansu Hydroelectric Power Plant is located in the Murgul District of Artvin Province in the Eastern Black Sea Region. Water for the project is supplied by Kabaca stream, the main branch of Murgul Creek, a side branch of Çoruh River.

Cansu HPP is a river-type power plant awarded with a 49-year production license. Overall capacity of the regulator and the facilities that are constructed around the river mouth is set and designed as 5.00m3/hour.

Cansu Hydroelectric Power Plant has an installed capacity of 11.34 MW, and its total production capacity is 51.571 GWh per year. The power plant has been producing power since it was put into service on 19.07.2008.

Cansu Elektrik Üretim A.Ş.

MERAL ELEKTRİK ÜRETİM A.Ş.

ESENDURAK HYDROELECTRIC POWER PLANT-ERZURUM

Esendurak Hydroelectric Power Plant is located in the Tortum District of Erzurum Province in the Eastern Black Sea Region. Water for the project is supplied by Alapınar stream, the main branch of Tortum Creek, a side branch of Çoruh River.

Esendurak HPP is a river-type power plant awarded with a 46-year production license. Overall capacity of the regulator and the facilities that are constructed around the river mouth is set and designed as 5.00m3/hour.

Esendurak Hydroelectric Power Plant has an installed capacity of 9.52 MW, and its overall production capacity is 42.421 GWh per year. The power plant has been producing power since it was put into service on 23.10.2012.

Meral Elektrik Üretim A.Ş.

ARTVİN ENERJİ ELEKTRİK ÜRETİM A.Ş.

BUCUR HYDROELECTRIC POWER PLANT-ARTVİN

Bucur hydroelectric power plant is located in Artvin.

Currently the power plant has an installed capacity of 3.13 MW whereas its projected overall production capacity is 17.340 GWh.

Bucur HPP is currently going through the licensing process with the Energy Market Regulatory Body (EPDK).

SOLAR POWER PLANTS

  • Erzurum Solar Elektrik Üretim Tic.ve San. A.Ş.
  • Ilıca Doğu Elektrik Üretim Tic. ve San. A.Ş.
  • Aziziye Elektrik Üretim Tic. ve San. A.Ş.
  • Erzurum Güneş Elekt.Üretim Tic. ve San. A.Ş.
  • Meral Solar Elektrik Üretim Tic.ve San. A.Ş.
  • Ejder Solar Elektrik Üretim Tic.ve San. A.Ş.
  • Ateş Solar Elektrik Üretim Tic.ve San. A.Ş.
  • Feyzan Solar Elektrik Üretim Tic.ve San. A.Ş.

OTHER ENERGY COMPANIES

YEŞİL GÜÇ ŞARJ SİSTEMLERİ ENERJİ TİC. VE SAN. A.Ş.

Our company was incorporated in 2012 with a focus on a wide range of areas in energy industry, following extensive R&D studies on electrical vehicle charging systems between 2010-2011. Keeping its focus on electrical vehicles and electrical charging systems, our company has expanded its field of business as of 2014, going into electrical cleaning equipment industry.

The increasing awareness of carbon footprint and high efficiency of electrical vehicles in our ever-changing and developing world lead us, at Yesil Güç Enerji, to go into electrical cleaning and service vehicles industry. Our company provides the most efficient solutions with our value of "Zero Carbon Footprint" with a view to responding to human needs, reducing carbon emission and increasing quality of life in society.

Our company is dedicated to create higher quality and silent working and living spaces by offering customer-oriented solutions in the fast growing electrical cleaning and service vehicles industry, contribution to air purity in indoor/outdoor areas, and minimizing noise pollution.

We aim to have a leading position in the industry with our wide range of solutions and expert team in this developing industry.

Yeşil Güç Şarj Sistemleri Enerji Tic. ve San. A.Ş.